Project Summary Project located on the existing Divertiland parking space, featuring solar panels supported by a carport structure. The park will create energy without using parking space. It will contribute to Divertiland waterpark consumption in a sustainable way, and it will inject in the grid the excess energy generated. Project
no responses
31 July 2022
Project Summary Project located on main Divertiland office building, designed for Divertiland park self consumption. Project Details Type Rooftop Power 0.5 MWp Land Size 500 sqm Location Chiajna, Ilfov Distance from Bucharest center 12 km Distance to substation 1 km Ready to Build date RtB Facebook-f Linkedin Project Summary The
no responses
31 July 2022
Project Summary 3 PV parks located in Butimanu/Crevedia area, with installed power between 3 and 8 MWp. Connection to the 20kV grid. All EVT projects will feature energy storage solutions. Project Details Type On ground Power 17 MWp Land Size 19 ha Location Butimanu, Crevedia Distance from Bucharest center 33
no responses
31 July 2022
Project Summary Project located in Tartasesti town. Project Details Type On ground Power 81 MWp Land Size 87 ha Location Tartasesti, Dâmboviţa Distance from Bucharest center 28 km Distance to substation 1.5 km Ready to Build date Q1 2025 Facebook-f Linkedin Project Summary The combination of renewable energy sources, wind
no responses
31 July 2022
Project Summary Project located in Cojasca town. Connection solution identified in electric distributor's substation. Possibility to expand the project with additional 70 hectars. Project Details Type On ground Power 33.5 MWp Land Size 40 ha Location Cojasca, Dâmboviţa Distance from Bucharest center 38 km Distance to substation 7.7 km Ready
no responses
31 July 2022
Project Summary Project located in Urziceni town, with direct access to national road DN2. Adjacent to Ialomita, Alfa projects. Connection into electric distributor's substation, located 4.4 km from the project. Project Details Type On ground Power 31.7 MWp Land Size 35.5 ha Location Urziceni, Ialomiţa Distance from Bucharest center 50
no responses
31 July 2022
Project Summary Project located in Urziceni town, with direct access to national road DN2. Adjacent to Ialomita, Omega projects. Connection into electric distributor's substation, located 4.4 km from the project. Project Details Type On ground Power 34.9 MWp Land Size 45.5 ha Location Urziceni, Ialomiţa Distance from Bucharest center 50
no responses
31 July 2022
Project Summary Project located in Urziceni town, with direct access to national road DN2. Adjacent to Alfa, Omega projects. Connection into electric distributor's substation, located 4.4 km from the project. Project Details Type On ground Power 38.9 MWp Land Size 48.5 ha Location Urziceni, Ialomiţa Distance from Bucharest center 50
no responses
26 July 2022
Project Summary Project located in Butimanu town, with direct access to national road DN1A.The project is developed in 2 phases. Connection approved directly into distributor's substation located 2.5 km away from the park. Project Details Type On ground Power 44.4 MWp Land Size 52 ha Location Butimanu, Dâmboviţa Distance from